SanjVIEW 7 for Infrared (IR) Camera
SanjVIEW 7 for Infrared (IR) Camera
Opening and initial setup:
- Open SanjVIEW v7.0 from the Computer desktop.
- Center the sample in Project Manager and focus on the desired device.
System Status:
- Confirm all indicator lights are green for your connected system.
- Select the camera to use, then uncheck "INT Vo 20mA Range" to bypass the 20 mA current limit.
- Click "Temp Control" tab; toggle ON/OFF and view readings for Stage, Thermal Coupler (TC), and ROI. Set Point to 75, then click "Stage State" to turn on the stage.
- Click "Auto Focus" tab; select objective magnification (example: 5X).
- Click "Center Stage" ON to center the Piezo controller or other external autofocus controller (only if applicable). (Note: the microscope may need refocusing after centering.)
- Click the file browser icon, choose the save folder, click "Current Folder."
- Select the desired imaging operation.
Note: Transient Thermoreflectance is not available while using an Infrared camera.
Steady State: (Project Manager → "Steady State")
Hardware:
- Enter the desired Base Temp (°C) (example: 75) and click "SET" next to Set Base Temp.
- Turn Stage State "ON."
- Set "Vo ON Voltage" to 10V.
Timing/Illumination:
- Set Device On Time to 10.
- Set Image Averages (#cycle) to 10.
3D Alignment — Focus ROI / Capture Reference: same procedure as the Visible-camera Steady State workflow above.
Start Measurement:
- Click "START Measurement."
- Progress shows in the System Status bar ("Turn OFF" after each cycle) with a Loop Iterations count. (If red indicator lights appear in System Status, adjust the Alignment Reference.)
- Under Save Path, confirm directory/name; add a filename prefix (example:
C:\Data\Qualification\SS, prefix "SS"). - Click "Save Every Cycle," then "Save Data" when ready. (Save before stopping.)
- Stop via "STOP MEASUREMENT," then "Return to Project Manager," or File → Quit.
Calibration: (Project Manager → "Calibration")
Hardware:
- Set "Magnification" to match the objective (example: 5x).
- Set "High Temp" to 120 °C and "Base Temp" to 75 °C.
- Turn "Stage State" ON.
- Click "Set Low Temp" to initialize the chuck to the base temperature.
- Click "Use Chuck Sensor" to use the embedded sensor (off = external thermal probe).
Timing/Illumination:
- Set Stage Heating Time to 40.
- Set Image Averages (#cycle) to 50.
3D Alignment — Focus ROI / Capture Reference: same procedure as above.
Start Measurement:
- Click "START Measurement." The system cycles through temperatures, showing "Calibration Done" after each cycle and a Loop Iterations count.
- Select the region on Thermal Image View to get the Calibration Factor (shown in "Cal Fact").
- Under Save Path, confirm directory/name (example:
C:\Data\Qualification\CAL, prefix "CAL"). - Click "Save Every Cycle," then "Save Data." (Save before stopping. If the thermal image is blurry, adjust Alignment Reference.)
- Stop via "STOP MEASUREMENT," "Return to Project Manager," or File → Quit.
Movie Mode: (Project Manager → "Movie Mode")
Control Settings:
- Set "Voltage Out" to 10V.
- Click "Update V" to apply voltages.
- Set "DUT Pulse (s)" (example: 1s); click "Update Timing."
- Confirm "Save Whole Series" is on (default).
- Click the "File Path" icon or type the desired path; select a name.
- Click "Start Movie" on the "EZ500 Movie Mode Acquisition" panel.
- Click "Save Image." (Note: Movie Mode saves a series of 105 files per cycle when you click "Save Image.")
- To stop: click "Start Movie" to stop, then File → Exit.
SanjAnalyzer (IR path):
System Status:
- Confirm camera is set to INFRARED.
- Click "SanjAnalyzer" to open the "SanjVIEW Image Analyzer" window.
Process Data: same workflow as the Visible-camera SanjAnalyzer procedure above (Calibration tab → Point to Point method → load CTR map → select analysis file → draw ROI box(es) → adjust scale/averaging → Settings tab → save/process series).